• Tilman Residence

    20 Images

  • Pietraszek Kitchen

    9 Images

  • Outdoor Kitchen

    10 Images

  • May Residence

    17 Images

  • Eleftherio Residence

    28 Images

  • Family Room Addition

    12 Images

  • Nicoletta Residence

    24 Images

  • Kahn Kitchen

    10 Images

  • Master Bathroom Remodel

    6 Images

  • Rosati Residence

    12 Images

  • Breitenbach Residence

    7 Images

See allCollapse boards

Tilman Residence

Interior renovation to open up the first floor, create an updated kitchen, and install new floors and stairs.

1

All flooring and trim work in foyer was replaced. Stairs have new oak treads and a new cable rail system.

2

All flooring and trim work in foyer was replaced. Stairs have new oak treads and a new cable rail system.

1

Wall between kitchen and family room was removed and steel beam was installed to open up the floor plan. Living room has new flooring. Ceiling was stripped for new lighting. The existing fireplace, windows, and exterior doors were kept.

1

Wall between kitchen and family room was removed and steel beam was installed to open up the floor plan. Living room has new flooring. Ceiling was stripped for new lighting. The existing fireplace, windows, and exterior doors were kept.

1

Wall between kitchen and family room was removed and steel beam was installed to open up the floor plan. Living room has new flooring. Ceiling was stripped for new lighting. The existing fireplace, windows, and exterior doors were kept.

1

Kitchen was fully demolished. Walls were removed to open up the floor plan. An island was added for more work space. All new cabinets, counters, and appliances were installed.

1

Kitchen was fully demolished. Walls were removed to open up the floor plan. An island was added for more work space. All new cabinets, counters, and appliances were installed.

1

Kitchen was fully demolished. Walls were removed to open up the floor plan. An island was added for more work space. A glass cabinet in the island provides display for fancy glassware.

1

Kitchen was fully demolished. Walls were removed to open up the floor plan. An island was added for more work space. All new cabinets, counters, and appliances were installed.

1

Walls in dining room were removed for more efficient use of space. Door was removed to improve circulation. Dining room has new floor and new doors into office.

1

Hallway from dining room to entry was reconfigured for more efficient use of space and better circulation. New hardwood floors and new French doors to office were installed.

1

Landing at the the foyer has new floors, cable rail system, and stair treads.

41

Stairs have new oak treads and a new cable rail system.

14

Stairs have new oak treads and a new cable rail system.

4

Stairs have new oak treads and a new cable rail system.

30

Landing has new floors and new cable rail system. Stairs have new oak treads and a new cable rail system.

Estimate: $20,500

19

Master bath was fully renovated. Master bath includes bath tub, shower stall, and double vanity.

1

Shower stall in master bath is fully tiled with granite seat and shelves.

1

Master bath was fully renovated. Master bath includes bath tub, shower stall, and double vanity.

74

Master bath was fully renovated. Half wall by bath tub maximizes storage.

Profile picture for JPS Construction and Design
JPS Construction and Design
(Be the first to write a review)
Responsiveness:
Price:
Work quality:
Punctuality:
Address:JPS Construction and Design  575 E. Main Rd. Box #6  Middletown,  RI  02842
Phone:(508) 341-6182
Contact JPS Construction and Design

Email successfully sent!Submission failed!