Active
  • $950,000

    12705 W 174th St, Overland Park, KS 66221

    4beds
    3,111sqft
    : 
    Single Family Residence
    Built in 2026
    0.29 Acres Lot
    $-- Zestimate®
    $305/sqft
    $100/mo HOA

    What's special

    Sleek architectural detailsHigh-end interior finishesTwo convenient laundry roomsWine storage areaMassive walk-in closet
    Introducing the HUDSON REVERSE by Doyle Construction – Now Available on picture perfect Lot 473 in Chapel Hill! The ever-popular Hudson 1.5 Story is now reimagined as a stunning Reverse 1.5 Story, tucked away at the end of a cul-de-sac and backing to community open space with a tree-lined view. This mid-contemporary home stands out with its striking exterior of stucco, stone, & stained horizontal lap siding. Enjoy both a covered deck on the main level and a covered walkout patio below, ideal for relaxing or entertaining year-round. Inside, you'll find TWO convenient laundry rooms, sleek architectural details, and high-end interior finishes that reflect Doyle Construction’s unique style & fine craftsmanship. The The primary suite boasts a massive walk-in closet you’ll have to see to believe & a detail trim bed wall! The finished lower level features a wet bar, wine storage area & spacious family room with a television cabinet along with 2 bedrooms. Relax on the covered deck complete with a fireplace for cool evenings! Currently at Trim STAGE (December 2025) – which means there's still time to customize your finishes! Don’t miss this opportunity to make this home your own in one of Overland Park’s most desirable communities! Chapel Hill features A+ amenities to include two swimming pool (one competition sized), pickleball, clubroom/club house, walking trails and more all immediately adjacent to the 1200 acre (m/l) Heritage Park complex featuring 18 hole golf course, recreational lake with sand beach & marina, picnic shelters, sporting fields, 30 acre (m/l) off leash dog park, equestrian trails and more! Model to show of a different floor plan is available and open daily for finish examples of the building company's presentation. EST. Completion 1st Quarter 2026
    137 days
    |
    119
    |
    3
    |
    • Loading
    • Loading