New construction
  • $499,000

    259 Breakwater Blvd LOT 338, Panama City Beach, FL 32413

    2beds
    1,665sqft
    : 
    Single Family Residence
    Built in 2025
    4,800 Square Feet Lot
    $492,900 Zestimate®
    $300/sqft
    $200/mo HOA

    What's special

    New construction. This gorgeous 2-bedroom, 2-bath, 2 car garage home with an office room offers 1665 sq. ft. of elegance and comfort. From the moment you step onto the paver driveway, you'll be captivated by the blend of modern design and natural beauty. The glass-paneled office provides a tranquil space to work or relax, with an abundance of light flowing through the space.As you enter, you'll immediately notice the soaring 10-foot ceilings throughout, complemented by tray ceilings in the spacious great room and luxurious primary bedroom. The open-concept design invites effortless living, with a beautifully upgraded kitchen featuring a large island perfect for entertaining. Whether you're preparing a casual meal or hosting friends, this kitchen makes every moment feel special. Unwind in your primary suite, a true sanctuary with a spa-like bath featuring a walk-in tile shower, a large soaking tub, dual vanity and spacious walk-in closet. Step outside onto your private covered lanai, where you can enjoy morning coffee or evening sunsets in complete privacy, thanks to the surrounding privacy wall and the tranquil beauty of the woods beyond. This outdoor space feels like an extension of your living area, with the added luxury of paver details that tie everything together. This gated community is filled with resort style amenities, including pool, clubhouse, fitness center, pickleball courts, tennis court, playground, and a multi-purpose field. Short drive to public beach access, Pier Park shopping, dining and fun entertainment, airport, future FSU/TMH medical campus, future West Bay Center with Publix and recreation outdoor activities at Frank Brown Park. Don't miss out on the opportunity to live in a place that combines luxury, serenity, and convenience all in one. Construction estimated completion May 2026.
    14 days
    |
    108
    |
    6
    |

    Likely to sell faster than

    • Loading
    • Loading