New construction
  • $796,423

    55 Northbrook Dr Lot 4, Murrells Inlet, SC 29576

    4beds
    3,590sqft
    : 
    Single Family Residence
    Built in 2025
    0.46 Acres Lot
    $-- Zestimate®
    $222/sqft
    $48/mo HOA

    What's special

    Welcoming foyerWooded lotLarge front porchCoffered ceilingBlack progress lighting fixturesWrapped kitchen islandDesigner trim package
    The IVEY is back! Transitional Arts & crafts design with Coastal Farmhouse flair. A large front porch, 4 Bedrooms, 4.5 Baths, a study with glass doors, a loft, back porch, and a 3-car garage on a wooded lot. This beautiful home boasts a welcoming foyer open to the study and dining room with a coffered ceiling and a butler's pantry entry into the Gourmet kitchen. The great room includes a 12x8 slider, soaring ceilings and the enjoyment of the open kitchen and breakfast nook. The Gourmet kitchen features rich Maple Rye and Sage kitchen cabinets, a wrapped kitchen island, Calcutta Royale quartz counter tops, Whirlpool appliances (exhaust hood vented outside, dishwasher, wall oven, wall microwave), a Kitchen-aid induction cooktop, under cabinet lights, pendant lights, and a white cast iron Kohler apron sink. The first-floor primary bedroom includes a huge walk-in closet and a generous bathroom with a 5ft walk-in tile shower and double vanity. Upstairs offers 3 bedrooms private bedrooms, 3 baths, and a loft. Easy maintenance sunbathed pecan Mohawk REV Wood floors throughout downstairs, oak treads leading upstairs, Daltile in all baths, Quartz countertops in all baths, black Progress Lighting fixtures, a designer trim package, and black bath plumbing fixtures. A DOE Zero Energy Ready Home. 100% Energy Star Certified and EPA Indoor AirPlus Qualified featuring the complete Tyvek house wrap system, a Broan Energy Recovery Ventilated Fresh Air system, spray foam insulation, and 2x6 construction which means improved energy efficiency and indoor air quality to give you a healthier, and more comfortable home with less noise, less air loss, and a lower utility cost. November 2025 Anticipated completion date.
    16 hours
    on Zillow
    |
    172
    |
    5
    |
    • Loading
    • Loading