New construction
  • Listed by: 

    CLIFF WAITS 564-236-4602,

    Holt Homes Realty, Llc,

    GREGORY WILLIAMS,

    Holt Homes Realty, Llc

    $570,910

    704 Magnolia Ave, Woodburn, OR 97071

    3beds
    1,656sqft
    : 
    Single Family Residence
    Built in 2025
    6,098 Square Feet Lot
    $571,000 Zestimate®
    $345/sqft
    $99/mo HOA

    What's special

    Airy en-suite bathroomAmple storageLight-filled family roomPractical drop zoneCoffered ceilingSerene primary bedroomGenerous walk-in closet
    Discover comfort and convenience at Marion Pointe in Woodburn. Ideally located just 30 minutes from both Salem and Portland, with easy access to the freeway. Nestled alongside the scenic Oregon Golf Association Golf Course, this community features a beautiful park with a playground for all to enjoy. This thoughtfully designed single-level home offers a spacious 3-bedroom, 2-bath open floor plan perfect for modern living. Sample Images shown Estimated completion in November Discover comfort and convenience at Marion Pointe in Woodburn. Ideally located just 30 minutes from both Salem and Portland, with easy access to the freeway. Nestled alongside the scenic Oregon Golf Association Golf Course, this community features a beautiful park with a playground for all to enjoy. This thoughtfully designed single-level home offers a spacious 3-bedroom, 2-bath open floor plan perfect for modern living. Enter from the garage into a practical drop zone ideal for storing coats, shoes, and backpacks. A wide hallway leads into the light-filled family room, kitchen, and dining area—designed for both relaxing and entertaining. Enjoy a large island perfect for meal prep or morning coffee, plus an oversized pantry that keeps your counters clutter-free. Retreat to your serene primary bedroom with a coffered ceiling, a generous walk-in closet, and an airy en-suite bathroom. Two additional bedrooms also feature walk-in closets, providing ample storage throughout the home. Set in a golf course community. Sample Images Shown Estimated completion in November
    26 days
    |
    129
    |
    5
    |
    • Loading
    • Loading